Short answer
The answer, before the reasoning
Retain more than the final emissions report. For each analysis and reporting cycle, preserve the legal and boundary basis, raw operating records, invoices and meter data, maintenance and calibration evidence, laboratory results, factors and GWP versions, calculation workbooks and scripts, estimate files, reconciliations and approvals, verifier requests and findings, the exact submitted package, receipts, corrections and authority correspondence.
Apply a rolling five-year clock from each analysis, while retaining records longer where another law, permit, contract, investigation, legal hold or corporate policy requires it.
Prepared in British English as a practitioner Knowledge Card Package: answer, explanation, application, evidence, connections and publishing layer.
Why the final number is not enough
A figure such as "42,600 tCO2e" cannot be verified from the figure alone. A reviewer needs to know which facility, source streams, gases, period, activity records, factors, units, formulas, estimates and approvals produced it. If a value changes after filing, the company must also show which version was filed, why it changed and whether the authority was notified.
Retention therefore supports four distinct needs:
• reproduce the calculation;
• demonstrate that the reporting boundary was complete;
• respond to verification, inspection or authority questions; and
• preserve continuity when staff, systems, suppliers or methods change.
Figure 1. Five-year Article 6 retention architecture. Branded educational visual by London Reporting Academy.
In practice
| Quick orientation | Practical answer |
|---|---|
| Express legal floor | Record of measured emission quantities for five years from each analysis |
| Access right | Authorised Ministry or competent-authority judicial officers may access the records during that period |
| Rolling start date | The date of each analysis, not simply the publication or filing date |
| Supporting evidence | Retain records needed to reproduce and explain the measured quantities and reports |
| Longer retention | Apply where another obligation, open matter or legal hold requires it |
| Cybersecurity objective | Preserve availability, integrity, confidentiality, provenance and controlled disposal |
The statutory floor and the defensible evidence pack
The safest way to read Article 6(1)(c) is to distinguish two layers.
Statutory minimum
The Source must retain a record of measured emission quantities for five years from the date of each analysis and make the records accessible to authorised officers during that period.
Supporting evidence needed to make the record meaningful
The final measured quantity should be supported by the records that allow it to be reproduced and assessed. These supporting documents may also be required by an authority form, monitoring plan, verifier, permit, inspection or internal control policy.
Do not write that Article 6 expressly names every supporting document unless a current implementing instrument does so. State instead that the records are retained to support the legal record, periodic report and verification trail.
A five-layer retention architecture
Layer 1 - legal, scope and reporting basis
Retain:
• Article 6 designation notice or applicable list;
• legal entity, branch, operator and facility details;
• permit and free-zone status;
• competent-authority correspondence;
• organisational and operational boundary memo;
• source, facility and emission-source register;
• reporting period and route confirmation;
• approved monitoring plan or methodology; and
• current forms and instructions.
This layer explains why the organisation reported and what the inventory covers.
Layer 2 - source data and operating records
Retain original or controlled copies of:
• fuel invoices, delivery notes and fuel-card records;
• utility invoices and meter exports;
• tank dips, stock movement and mass-balance records;
• production, throughput and operating-hour data;
• refrigerant purchase, recharge, recovery and disposal records;
• maintenance, leak and equipment logs;
• laboratory analyses and sampling records;
• calibration certificates and meter maintenance;
• waste, wastewater or process records where relevant;
• supplier statements and landlord data; and
• source-system extracts and query parameters.
Preserve the source record, not only a manually retyped summary.
Layer 3 - methodology and calculations
Retain:
• factor register and archived source publications;
• GWP set and gas mapping;
• calorific values, density and unit conversions;
• calculation workbooks and protected formula versions;
• scripts, code, data models and transformation logs;
• estimate and data-gap register;
• uncertainty and sensitivity analysis;
• allocation and consolidation logic;
• duplicate and completeness tests;
• recalculation and base-year policy where used; and
• methodology change log.
The archive should make calculations executable or reproducible even if the original preparer leaves.
Layer 4 - controls, approvals and verification
Retain:
• preparer and reviewer sign-offs;
• reconciliations to finance, operations and permits;
• variance analyses;
• access and change logs;
• internal audit or readiness findings;
• management representations;
• verifier proposal, scope and independence checks;
• evidence requests and responses;
• site-visit records;
• findings, corrections and closure evidence; and
• final verification statement or report.
Layer 5 - submission and correspondence
Retain:
• exact filed forms and attachments;
• read-only final package;
• file names and hashes;
• portal submission ID and timestamp;
• receipt, acknowledgement and status;
• authority questions and company responses;
• correction and resubmission packages;
• acceptance or closure record; and
• inspection document-provision log.
How to calculate the five-year period
Article 6 refers to five years from the date of each analysis. This creates a rolling record rather than one simple annual deletion date.
For each analysis record, capture:
• analysis ID;
• analysis date;
• reporting period;
• relevant source and facility;
• minimum retention date;
• longer-retention basis, if any;
• legal-hold status; and
• disposal approval.
Illustrative example. A laboratory analysis dated 18 February 2026 has a minimum Article 6 retention date of 18 February 2031, subject to any longer requirement. A year-end calculation approved on 20 March 2027 has its own date. A corrected analysis should not erase the original or restart the clock invisibly; retain both and document the relationship.
A retention schedule template
The schedule should be approved by legal, records management, IT security and the climate-reporting owner.
In practice
| Record class | Owner | Authoritative format — Retention start — Minimum / extended rule — Access class |
|---|---|---|
| Designation and authority basis | Legal / compliance | Signed PDF and correspondence file — Issue / receipt date — Life of obligation plus policy period — Restricted |
| Raw activity records | Operations / finance | Source export, invoice or certified scan — Analysis / use date — At least supporting Article 6 period — Controlled |
| Meter and calibration evidence | Engineering / HSE | Certificate and maintenance log — Analysis / calibration date — At least supporting Article 6 period — Controlled |
| Factor and GWP files | Methodology owner | Archived publication and register — Calculation approval date — Preserve every factor version used — Controlled |
| Calculation workbook / code | Reporting team | Locked workbook, script and data snapshot — Analysis approval date — At least five years from analysis — Restricted write |
| Estimate and uncertainty files | Data owner | Register and support file — Analysis approval date — At least five years from analysis — Controlled |
| Review and approvals | Controller / governance | Workflow export or signed record — Sign-off date — At least linked reporting period — Restricted |
| Verification pack | Reporting / legal | Engagement, requests, findings and statement — Engagement / statement date — Contract and Article 6 support period — Restricted / privileged where applicable |
| Submission package | Filing administrator | Read-only package and receipt — Submission date — At least linked Article 6 period — Restricted |
| Authority correspondence | Legal / compliance | Complete case file — Receipt / sent date — Matter closure plus policy period — Restricted |
Version control: preserve filed, corrected and restated numbers
Never overwrite a filed workbook or report. Use a version structure such as:
• Draft working versions;
• Inventory freeze version;
• Verification-adjusted version;
• Filed version;
• Corrected / resubmitted version; and
• Restated comparative version.
Each version should record the author, reviewer, date, reason, changed cells or data, effect on emissions, authority notification and approval. Use stable source IDs and factor IDs so that differences can be traced.
A change log should distinguish:
• error correction;
• late actual data replacing an estimate;
• factor or GWP update;
• boundary or structural change;
• method improvement; and
• operational emissions reduction.
This prevents a methodological change being misrepresented as performance.
Cybersecurity and records integrity
Figure 2. Secure retention lifecycle. Branded educational visual by London Reporting Academy.
A record can be retained for five years and still fail if it is altered, inaccessible or stripped of context. Apply the following lifecycle.
Capture
Collect from the authoritative system or signed source. Record owner, date, system, query and extraction parameters. Avoid screenshots where a structured export is available.
Validate
Check completeness, format, malware, duplicate files and readability. Confirm that scans are legible and spreadsheets open without broken links.
Freeze
Create the approved version. Apply a hash, immutable identifier or write restriction. Store the data snapshot used by the calculation.
Control access
Use role-based access, least privilege, multi-factor authentication and separate write / approval rights. Restrict commercially sensitive, personal or privileged evidence.
Back up and test
Maintain backups in accordance with the organisation's resilience policy. Test restoration rather than assuming the backup works. Avoid a single cloud account or individual laptop as the only copy.
Hold or dispose
At the end of the retention period, check legal holds, inspections, disputes, verifier matters, contracts and other laws. Disposal should be authorised, logged and secure. Do not delete related source, calculation and submission records separately if doing so destroys the evidence chain.
Data classification and confidentiality
Classify records at least as:
• public or published;
• internal;
• confidential commercial;
• personal data;
• legally privileged; and
• regulator / verifier restricted.
The filing team should know what must be submitted, what is retained for inspection and what requires legal review before disclosure. Article 6 access by authorised officers does not justify unrestricted internal access or casual transfer to third parties.
Inspection-ready access
Prepare an index that allows authorised records to be located quickly without handing over unrelated information. The index should show:
• record ID and description;
• source / facility and period;
• file path or records-system reference;
• owner and access approver;
• confidentiality class;
• retention date;
• linked calculation or filing; and
• whether the record has been provided to an authority.
Maintain a document-provision log during inspection: request, authority, date, record, version, provider and any limitation or follow-up.
Hypothetical example: corrected refrigerant record
Illustrative scenario - not company data. A company reports refrigerant emissions based on a maintenance log showing 120 kg recharged. After filing, the service provider confirms that 20 kg related to a different facility.
The company does not edit the filed workbook. It preserves:
• the original service log and filed calculation;
• the provider's correction;
• the boundary and materiality assessment;
• the corrected calculation and review;
• the authority notification or resubmission record; and
• the final closure status.
Both the original and corrected analyses receive retention dates. The incident is also linked to a remediation action requiring facility IDs on future maintenance records.
In practice
Common mistakes and how to correct them
| Mistake | Why it fails | Correction |
|---|---|---|
| Retaining only the PDF report | The number cannot be reproduced | Preserve source, method, factors and calculations |
| Starting every clock on the filing date | Article 6 refers to each analysis | Track analysis-level dates |
| Deleting after exactly five years automatically | Other duties or holds may apply | Run a pre-disposal legal and records check |
| Keeping live links to online factors | Website content can change or disappear | Archive the exact source file and version |
| Overwriting corrected workbooks | Original filing trail is lost | Use immutable filed and corrected versions |
| Storing evidence in personal email or laptop | Access and continuity are weak | Use a controlled records repository |
| Giving every user edit rights | Increases alteration and fraud risk | Apply role separation and audit logs |
| Encrypting without recovery controls | Records may become inaccessible | Manage keys, backups and restoration tests |
Readiness
Practitioner checklist
- Define the Article 6 analysis record and its retention start date.
- Maintain a record-class schedule with owner and authoritative format.
- Preserve raw source records, not only transcribed totals.
- Archive factors, GWP tables and methodology versions used.
- Lock calculation workbooks, scripts and data snapshots.
- Retain estimates, uncertainty, reconciliations and approvals.
- Preserve verifier requests, findings and closure evidence.
- Save exact filed, corrected and restated packages separately.
- Retain submission IDs, receipts and authority correspondence.
- Apply role-based access, encryption, backup and audit logs.
- Test restoration and file readability periodically.
- Check legal holds and other retention duties before disposal.
Self-check
- Can a new team member reproduce a five-year-old emissions result without contacting the original preparer?
- Does every filed total link to raw data, factor, formula, review and submission evidence?
- Are retained records protected against both unauthorised alteration and accidental inaccessibility?
- Can the company identify which records are legally held, confidential or ready for disposal?
In practice
Indicator and concept mapping
| Instrument | Reference | Relationship — Role / limitation |
|---|---|---|
| Federal Decree-Law No. 11 of 2024 | Article 6(1)(c) | Direct — Five-year record from each analysis and authorised access |
| Federal Decree-Law No. 11 of 2024 | Article 6(1)(a)-(b) | Supporting — Inventories, periodic reports, activity and reduction data supported by retained evidence |
| Federal Decree-Law No. 11 of 2024 | Article 14 | Supporting — Judicial-officer capacity for detecting violations |
| EAD Facility-Level MRV | 2026 workshop and reporting toolkit | Local implementation — Examples of invoices, gauges, factors, monitoring plans, verification documents and corrections |
| ISO 14064-1:2018 | Inventory information management | Supporting — Documentation and verification-readiness practices |
| ISO 27001 / corporate information-security framework | Internal control | Implementation practice — Security governance may support retention but does not replace Article 6 or local instructions |
Sources
Primary sources
Take it with you
The checklists as a working spreadsheet
Every checklist and table on this page, with empty status, owner and evidence columns for your team to fill in and keep.
✓ LRA AI Assistant · Human-in-the-loop
Ask about this guide
It answers from this page, and reaches into the linked disclosure cards when your question is about the standard itself. Your first two answers are free without signing in.
Go deeper · UAE FDL 11 / 2024
UAE Climate Law training
Obligations under Federal Decree-Law 11 of 2024, from inventory to the reduction plan.
Available as Guided Flex, Live Cohort, 1:1 Expert Mentorship or Corporate Programme.